Every device you install. One live map.
Cameras, locks, access points, TVs and phones: each one on its drawing, with its real status, from the first sheet to handover.
The drawing set becomes the project.
Riser Point puts every camera, card reader, access point and data outlet of a hotel on its drawing, then follows each one from purchase to commissioning: in the office, and on the phones of the crew installing it.
Example project. Status rings change as the crew reports from site.
Drop in the set. Get every sheet, in order.
Upload the consultant's PDF set and Riser Point splits it into one file per sheet, files each one by building and drawing set, and shows a preview of every sheet at once.
- A revision lands on the sheets it revises, so nothing placed on them moves.
- Every sheet keeps its versions, with one marked as the Contract version.
- Floors come from a number typed on each sheet. There is no list of levels to maintain.
Place every device where it goes.
Pick a type from the palette and click the drawing. Each pin carries its tag, its type and its discipline, and keeps its place on the sheet through every revision.
- A palette per discipline, with your own types, codes, colours and icons.
- Connect devices to their telecom room, door controller or floor port.
- Select a group, copy it to the next floor, and filter what the drawing shows.
CCTV
Access control
Wireless
Structured wiring
Infrastructure
CAM-305
- Type
- C1 Fixed camera
- Asset
- RP-01042
- Sheet
- T-301 · Level 3
- Status
- Pending
- Feeds
- IDF-3
The office app. Pins are paper: their colours read the same on any screen.
A status you can trust, with the photo to prove it.
Pending, in installation, installed, commissioned, or issue. Every change records who made it, when, a note and photos, and the history only ever grows.
- Status rings on the drawing show progress floor by floor.
- An issue stays red until someone resolves it on site.
- Nothing is overwritten. The database writes the history, and nobody edits it.
CAM-305 · Fixed camera
RP-01042 · T-301 Level 3 · Corridor west- Placed · PendingOct 12 · M. Ruiz, office
- In installationOct 21 · J. Ortega, on site
Cable pulled from IDF-3, 38 m.
- InstalledOct 22 · J. Ortega, on site
Mounted at 2.7 m, facing the lift lobby.
- CommissionedOct 24 · A. Silva, office
Stream checked on the NVR, channel 14.
Built for gloves, glare and the job site.
Installers see only the projects and drawing sets assigned to them, on their own phone, with large controls they can use without training. The office sees each update as it happens.
A QR on every device. An ID for its whole life.
Print labels by type or by device. Each one carries a permanent asset ID and a QR code that opens the device: on its plan for the installer, on its own page for the office.
- An asset ID is given when the device is placed, and never changed or reused.
- A label prints once. Reprinting is an admin's decision.
- Scan a batch of devices out of the warehouse, and back in when they return.
The bill of materials writes itself.
What a project needs is counted from the pins on its drawings, plus anything you add by hand. Each line is followed from needed to ordered, received, on site and installed, so you always know what is left to buy.
- Unit cost, labour and yearly licences, per line and per discipline.
- Cable measured from the distance between connected pins.
- Purchases received in part or in full. Door schedules, device lists and submittals exported when you need them.
| Item | Needed | Ordered | Received | On site | Installed | To buy |
|---|---|---|---|---|---|---|
| CCTV | ||||||
| C1 Fixed camera | 34 | 30 | 28 | 22 | 18 | 4 |
| C2 PTZ camera | 4 | 4 | 4 | 2 | 1 | 0 |
| Access control | ||||||
| R1 Card reader | 22 | 22 | 16 | 12 | 9 | 0 |
| Wireless | ||||||
| WAP-M Access point | 48 | 40 | 40 | 31 | 26 | 8 |
| Structured wiring | ||||||
| D1 Data outlet | 212 | 212 | 180 | 164 | 141 | 0 |
| CAT6 plenum ft · measured | 41,250 | 36,000 | 36,000 | 30,000 | — | 5,250 |
Example project. Every number is computed when you open the page. None of it is typed twice.
See the building's backbone, floor by floor.
The riser is drawn from the project itself: the telecom rooms, the devices each one serves and the backbone between them. Turn it into 3D to see the floors stacked on their real plans, or open a rack to see what is mounted and which port feeds which device.
- Trace any device back to the main distribution frame.
- Floors line up from two points, with one scale per building.
- Rack elevations and patch-panel ports assigned to each endpoint.
Check coverage, measure and mark up, right on the sheet.
Turn on the Wi‑Fi heatmap to check coverage before a single access point is hung. Calibrate a sheet with two points and measure to scale. Leave markups and comments where the question is.
- Coverage is computed from the access points on the plan and the walls between them.
- Riser Point PDF, a full PDF editor for drawings: markup, measure, compare and count symbols, in the browser.
Ask the project. Get the answer and where it came from.
The project manager agent reads the project's drawings, pins, purchases, specifications and spreadsheets. Ask what is left on a floor, what a spec requires or what changed this week. It answers with its sources, and fills your report templates.
- Every figure in an answer points to the record or document it came from.
- It works as the person asking, so it sees only what they can see.
- It reads PDFs, spreadsheets and the project's own data.
Example project.
Everyone sees their part. The database makes sure of it.
Access starts with an invitation. Admins see everything. Project managers run their own projects, without prices. Installers see the projects assigned to them. Clients follow progress in a read-only portal, with the modules you share.
- The interface hides what a person can't use, and the database refuses it.
- Blocking someone takes effect on their next click.
- Sign in with email or Microsoft. Files are stored privately, per project.
| Admin | Project manager | Installer | Client | |
|---|---|---|---|---|
| Projects | All | Their own | Assigned | Shared |
| Drawings and pins | Edit | Edit | Their sets | Read |
| Pin status | Any | Any | After check-in | — |
| Prices and costs | Yes | — | — | — |
| People | Everyone | Installers, clients | — | — |
| Portal modules | Choose | Choose | — | Read |
One project, from the first sheet to handover.
- 1
Drawings in
Upload the set. Sheets, versions and floors are sorted for you.
Drawings - 2
Design
Place devices, connect them, check coverage and draw the riser.
PinsRiserHeatmap - 3
Buy
The BOM comes from the drawings. Order, receive and see what's left.
Project Management - 4
Install
The crew checks in, takes material, labels devices and reports with photos.
Field appLabels - 5
Commission and hand over
Every device commissioned, every step on record, the client following along.
HistoryPortal
The whole project, in one file.
Export a project or a building as one documented file that people and AI tools can read. Edit it, import it back, and review every change before it is applied.
// casa-mareas.riserpoint.json { "project": "Casa Mareas Resort", "sheets": [{ "number": "T-301", "floor": 3 }], "pins": [{ "tag": "CAM-305", "type": "C1", "x": 0.100, "y": 0.500, "status": "commissioned" }] }
What people ask us first.
Who is Riser Point for?
Low-voltage integrators who install CCTV, access control, cabling, Wi‑Fi, AV and voice in hotels and resorts: their estimators, project managers and installers, and the owners who want to follow the work.
Do installers need to install an app?
No. Riser Point runs in the phone's browser and can be added to the home screen like an app. Installers get an invitation, create a password and start.
Which drawings can we upload?
PDF drawing sets of any size: each page becomes a sheet with its own versions. For the 3D riser, walls can also come from the architect's DXF.
What happens when a revision arrives?
Upload it. Each page is matched to the sheet it revises, a new version is added, and every pin stays where it was.
Can our clients see their project?
Yes, through a read-only portal. You choose which projects and which modules each client company sees.
Who can read our data?
Only the people you invite, and only what their role and their projects allow. The database checks every read and write. Files are kept in private storage.
Can we take our data with us?
Yes. A project exports to one documented file, and the catalog and the lists export to CSV.
What does a demo look like?
We show you Riser Point on a set of your own drawings, so you see your project in it, not an example.